20 stations of Shenzhen Metro Line 5 completed
On the morning of January 10, good news came from Shenzhen Metro Line 5 that the project construction of Shenzhen Metro Line 5 realizes another breakthrough. As the concrete pouring project on the last section of roof of Wuhe Station was completed, the aim of main body capping has been completed ahead of schedule. By now, among the 27 stations of Metro Line 5, the main body construction works of 20 have been completed.
Wuhe Station, locating at the south side under the crossing of Bulong Road and Wuhe South Road, is designed as a three-floor underground station, forming an interchange station with Line 16 that is now in planning.
Shenzhen Post Elaine Contributes to the Story.
Possibly Related Posts:
- Super computer Nebulae to run soon
- Parents with children under 3 to have more days off
- Shenzhen to participate in next farmers’ games
- Electric bike restrictions enhanced in Shenzhen
- Drunk driving resulted in car crash, four killed