Longgang Line, Line 3, Shenzhen Metro

Longgang Line will run 41.8 km with 30 stations from Hongling to Yitian Village and will be built in two phases. Construction on Phase I which runs 32.86 km from Caopu to Shuanglong began on 26 December 2005. Phase I was completed on 28 December 2010. The entire line is scheduled to open 30 June 2011. It will connect with Luobao Line at Laojie and Shopping Park, with Shekou Line at Futian, with Longhua Line at Children’s Palace, with Huanzhong Line at Buji and run out to Longgang in the north-east of the city.

Longgang Line of Shenzhen Metro in first phrase it runs northeastward from Chobu to Shuanglong. Longgang Line opened December 28, 2010.

The line is operated by Shenzhen Metro No.3 Line Operations Branch Corporation

  • 28 December 2010: Caopu – Shuanglong
  • 16 June 2011: Yitian – Caopu

 

Current Stations

Station Name
English
Station Name
Hanzi
Platform Types Transfer Location
Yitian 益田 Futian
Shixia 石厦
Shopping Park 购物公园 Luobao
Futian 福田 Shekou
Children’s Palace 少年宫 Longhua
Lianhuacun 莲花村
Huaxin 华新
Tongxinling 通新岭
Hongling 红岭
Laojie 老街 Luobao Luohu
Shaibu 晒布
Cuizhu 翠竹
Tianbei 田贝
Shuibei 水贝
Caopu 草埔 island (ele)
Buji 布吉 island (ele) Longgang
Mumianwan 木棉湾 island (ele)
Dafen 大芬 island (ele)
Danzhutou 丹竹头 island (ele)
Liuyue 六约 island (ele)
Tangkeng 塘坑 island (ele)
Henggang 横岗 island (ele)
Yonghu 永湖 island (ele)
He’ao 荷坳 island (ele)
Universiade 大运 island (ele)
Ailian 爱联 island (ele)
Jixiang 吉祥 island (ele)
Longcheng Square 龙城广场 island (ele)
Nanlian 南联 island (ele)
Shuanglong 双龙 island (ele)

Possibly Related Posts: